Update on South Wye switch module

Thought I would take a few photos of the South Wye Switch module. The center pier is a piece of two by four cut down to be a pier. The “south abutment”  is temporary which is why the beams are not level.

An aerial view of the steel beams section of the bridge over Gunpowder Run
An aerial view of the steel beams section of the bridge over Gunpowder Run
First look of the steel section of the bridge over Gunpowder Run
First look of the steel section of the bridge over Gunpowder Run

Update on South Wye switch module©

By H. Mathews June 2016

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s